Zambia 10TPH Rock Tin Ore Process Plant
JXSC has provided a successful 10TPH rock tin process plant in Zambia. We design the tin process plant flowchart & plant layout drawing according to ore conditions, provide a complete set of plant machines and send Chinese engineers to the mine site for plant installation & commissioning guidance.
Introduction
Minerals: Rock Tin Ore
Capacity: 10 TPH
Process: The tin ore mining process flow is Crushing –> Screening –> Grinding –> Concentration.
Solutions & Process
Rock Tin Mining Plant
Crushing
The rock gold-bearing ore is crushed by a Coarse jaw crusher, then feed into a Fine jaw crusher, fine crusher is the second section of the fine crushing process.
Screening
The output material of the fine crusher will feed to a vibrating screen to separate out bigger particles and smaller particles, and big particles (+25mm) return back to the fine jaw crusher for re-crushing.
Grinding
0-25mm particles go to the ball mill to grind super fine size(0.074-0.4mm).
Concentration
After grinding, the concentration equipment we used is Shaking Tables, total quantity is 24 sets which divide into two groups, 16 sets for the 1st group, 8sets for the 2nd group for re-concentration.
Equipment Lists
- Vibrating grizzly feeder – 1 set
- Swing feeder – 1 set
- Jaw crusher – 1 set
- Fine jaw crusher – 1 set
- Vibrating screen – 1 set
- Ball mill – 1 set
- Spiral classifier – 1 set
- Conveyor belt – 4 sets
- Slurry pump – 2 sets
- Water pump – 1 set
- Spiral concentrator – 16 sets
- Shaking table – 24 sets